Areva Wins Contract to Build Brazil’s Biggest Biomass Plant

Oct. 14 (Bloomberg) — Areva SA, a French nuclear-power
plant builder, won a contract to construct a 150-megawatt
biomass plant for Brazilian utility BOLT Energias.

The Campo Grande biomass power plant in the northeastern
state of Bahia will be the largest biomass facility in Brazil,
the Paris-based company said in a statement. The facility will
be fueled with woody biomass and is scheduled to start
operations in 2017.

Areva has built 95 biomass plants worldwide, with a total
installed capacity of more than 2,500 megawatts. Areva didn’t
immediately respond to e-mail and phone requests for comment.

To contact the reporter on this story:
Vanessa Dezem in Sao Paulo at
vdezem@bloomberg.net

To contact the editors responsible for this story:
Reed Landberg at
landberg@bloomberg.net
Robin Saponar, Steven Frank

About BloombergNEF

BloombergNEF (BNEF), Bloomberg’s primary research service, covers clean energy, advanced transport, digital industry, innovative materials and commodities. We help corporate strategy, finance and policy professionals navigate change and generate opportunities.

Available online, on mobile and on the Terminal, BNEF is powered by Bloomberg’s global network of 19,000 employees in 176 locations, reporting 5,000 news stories a day.
 
Sign up for our free weekly newsletter →

Want to learn how we help our clients put it all together? Contact us